WAN 2.7 pricing: from 10 credits / second
What WAN 2.7 costs on Made, in credits. The Generate button shows the same number before you run it, and a generation that fails is refunded.
1080p text-to-video and image-to-video with synchronized audio and flexible 2 to 15 second clips.
The exact rates
| What you generate | Price |
|---|---|
| Every second of output | 10 credits / second |
Prices last verified 2026-09-18. When the provider changes a price, this page changes with it.
What that means in practice
40 credits
one 4-second clip
150 credits
one 15-second clip
600 credits
60 seconds of finished output
Priced up front · credits roll over · failed generations refunded · every model on every plan
How WAN 2.7 compares on price
What one typical generation costs across other video models in Made.
| Model | Rate | Typical generation |
|---|---|---|
| Kling LipSync | 1.4 credits / second | 7 credits |
| Gemini Omni Flash 1.1 | from 3 credits / second | 12 credits |
| WAN 2.2 Turbo | 15 credits / video | 15 credits |
| WAN 2.2 5B | 15 credits / video | 15 credits |
| Veo 3.1 Lite | from 5 credits / second | 20 credits |
| MiniMax H3 Max Turbo | 4 credits / second | 20 credits |
In-depth comparisons
Pricing questions
- How much does WAN 2.7 cost per video?
- From 10 credits / second in Made.
- The full breakdown: 720p 10 credits/s · 1080p 15 credits/s · 4s at 720p = 40 credits.
- The Generate button shows the exact price in credits before you run it.
- Is WAN 2.7 priced per second or per clip?
- Per second of output, and the rate depends on the resolution you pick: 720p 10 credits a second, 1080p 15 credits a second. A 4-second clip at 720p costs 40 credits, the same number the Generate button shows.
- Does resolution change the WAN 2.7 price?
- Yes. 720p costs 10 credits a second, 1080p costs 15 credits a second. You pick the resolution before generating; the default is 720p.
- How do I pay for WAN 2.7 in Made?
- With credits. Every plan comes with credits and opens every model, WAN 2.7 included. The price in credits is on the Generate button before you run it, and each charge appears in your activity.
- What happens if a WAN 2.7 generation fails?
- Nothing is charged. If a generation fails — provider error, timeout, anything — its credits come back automatically. You only pay for output you receive.
- Do unused credits expire?
- No. Unused credits roll over, and every charge and refund appears in your activity.
See every model's rate on the full price sheet, or start generating in the editor.